Developer : M.T.R.C.
Main Contractor : Leighton Contractors (Asia) Ltd.
Hung Hom Station and Stabling Sidings (Contract No. 1112)
- Shatin to Central Link (Hung Hom North Approach Tunnels) (Contract No. 1111)
- Pedestrian Links at Tsz Wan Shan (Contract No. 1114)